Saturday, 14 June 2014

Decking Part 3 - Planking

Firstly I roughly laid out the planks according to which size needed to go where, then I shuffled them around switching port with starboard to get an even colour across the deck. I found two light or two dark strips next to each other tended to stand out a bit. Once I was happy with the overall look each teak plank was roughly cut, spaced out with off cuts to give a 6mm caulking gap and screwed down with over size washers.




All the edges were removed at this point and laid on top of the roughly cut planks, marked-out again using another off-cut to give the 6mm spacing, cut using a bandsaw and then belt sanded to the precise curve.




Once this process had been repeated round all edges and both skylights each plank was masked on the top face, spaced and screwed to test fit the whole deck, taking the time to draw round each washer so when it came to glueing each plank and each screw could be positioned easily and quickly. 








Thursday, 12 June 2014

Decking Part 2 - Edges

I made this moulding to cover the edges of the ply and frame the new deck. At 18 x 20 mm it was small enough to simply bend and screw in to place without steaming.



Cardboard templates were used to cut out the shape of the wheel house and maximise the amount of decking I could get out of each plank.




Rather than steaming the outer edge plank to achieve the required curve I laid 72mm wide strips close to the edge, marked out where to cut with this home made jig and cut and sanded them to a neat fit.




The same process was then repeated to cut the inner most edges to form a continuous 44 mm plank around the newly fitted edges and a 50 mm plank round the wheelhouse.



Wednesday, 11 June 2014

Decking Part 1 - Design

Teak decking the fore cabin roof was a job started by Alex Ritchie who very neatly laminated two pieces of 1/4 inch marine ply across the entire area. I picked up where he left off beginning by using a simple laser clamped to the wheelhouse roof to get a definitive centre line.




Using measurements taken from the middle outwards I was able to create a CAD drawing, and from there begin designing the layout based on the original 1908 Simpson Stickland drawings using straight wide planks. 



With all the calculations done I ordered over 100 meters of planned to size teak decking strips from Robbins Timber. Next step being to figure where each one goes according to my calculations..



Tuesday, 27 May 2014

May Progress

Blue stripe!





Cockpit almost complete.



I had a new solid teak door made to match the rest of the new additions. Replacing the rattly sliding door with a sealed, double glazed, hinged one.



Mediterranean white walls and hull, non-slip interdeck floor, and deks olje the bare teak benches.



Tuesday, 11 March 2014

Keys

This is a picture of my keys.

My keys

One is for my home in Devon, another for my home in Cheshire, the other is for the boat (well the massive shed with the boat in it) and lastly for my car. This neatly summarises my life for the past few months.

What does this have to do with the boat I've come here to look at I hear you ask. Well it means whilst there hasn't been many exciting updates on the blog, there has been many hours toiled away restoring every inch of the boat.

The good thing about restoring a boat in such lovely condition is for the most part restoration involves nothing much more than meticulous sanding, cleaning, masking, preparation and subsequent painting or varnishing. The bad thing about restoring a 42' boat in lovely condition is... well I'm sure you get my drift.

In recent weeks the patron saint of sanding finger tips away, trying the find the end of masking tape and watching paint dry has been my mum (Eileen) seen here posing for a photo.

Saturday, 7 December 2013

The National Library of Australia



The National Library of Australia's web archive PANDORA has chosen to add Australian Boat Restoration to their archive of carefully selected publications they consider are of significance and to have long-term research value.

Cool.




Tuesday, 15 October 2013

October Progress

Some photo's of work in progress and work that's been completed, the former being in the greatest abundance.




Some more glossy top coat on the hull.




Old wallpaper was used for masking off the blue waterline.





Side decks repaired and caulked.



Aft cabin windows double glazed.



Interior huon pine oiled.






Tuesday, 17 September 2013

Drawings

During the restoration I have been using drawings to help design, plan every detail of the boat, Up un-till now they have been messy, digital doodles to make decisions / calculations with but I've polished them in to something presentable to give an idea as the the looks and feel of the completed interior layout and design.



And yes I still haven't drawn a propeller. More details to come:)

Thursday, 11 July 2013

White

I applied the first coat of International Toplac Mediterranean White to the rear section to get an idea of coverage. Results = Good :)



Now to do the rest...




Wednesday, 10 July 2013

Boatfit Europe

Some exciting woodwork is being brought to the metaphorical table from the brains behind Boatfit Europe, or Paul as he's more commonly known. 



As mentioned previously the wheelhouse added by unfortunate high altitude balloonist Alan Ritche was never completed and still required doors, rear windows, and even a new roof after being left open to the elements for so long.





Paul's quality of work and attention to detail is the only I've come across so far that both equals and does justice to the original construction by Halvorsen & Gowland.



The decision to fit hinged doors as apposed to sliding is purely aesthetically, and I'm really pleased with the results.



As well as the necessary we're also replacing the rear windows with double glazed units to match the new wheelhouse with additional matching detail around the frames.



More to come soon.



Monday, 27 May 2013

Painting - Hull

Preparation is always the key to a good paint job, (as well a being a bad pun). This is why many hours, days, weeks (some of which I spent in Russia) have been put in to sanding and priming the hull both above and below the water line.

Firstly below the water line with 6 coats of International Primocon brushed on and sanded smooth every other coat.

The next step, above the waterline, has been much more interesting, well interesting enough to take some pictures. 4 coats of International Yacht Primer we applied, two thinned and sprayed for a key then two brushed to build thickness. Next a long board was used to flat the surface over a large area, the high spots revealing themselves as bare wood.



This process was repeated with a further two coats with some pretty good results, I've been reluctant to use any fillers over large areas as I worry any movement in the wood would risk cracks, where as a one part primer is more flexible and lends itself very well to being flatted out.



And to keep my painting guru (also known as Geoff) happy this is my dedicated primer gun, a suction fed DeVilbiss, because it holds more paint.


Next steps involve two coats of International Pre-Kote undercoat intertwined with more long boarding but this time with finer grade sand paper. Followed by 14 days ageing, (most of which I'll spend in Australia) before applying two coats of delicious Mediterranean White.

Tuesday, 14 May 2013

Engine In

With the bilges all lovely and white it was time to fit the lovely and white engine. Which all went rather well really.