Monday, 26 January 2015

Stainless Steel

Recent jobs completed include finishing the removable fore cabin hatch designed by Ritchie. The unit has been finished with 6 coats of International 2k varnish and I flush fitted polished 316 stainless steel piano hinges to give the clean design bonus of being easy to clean.



I replaced the old Vetus 110 stainless steel bollards with new Vetus 110 stainless steel bollards.



And finally a quick glimpse at the work in progress on the 316 stainless steel hand rails.





Thursday, 8 January 2015

Deks'ing the Decks



This week, I have mostly been, preparing the side decks and applying Deks Olje saturator to protect the bare teak. Splashing it on with a paint brush and wiping off the excess with a clean rag makes this a satisfyingly simple job. Next I'll be fabricating the stainless steel handrails... which is not so simple.